Irrigation pipe line diversion works for Mall of Egypt 6th October city

Owner
Majed AL Futtaim Properties Egypt Project Manager
Davis longdon – Egyptian Consulting house - MZECH
Main Contractor
El Dawlia Co. for Eng. And Gen. Cont.
Period
Feb. 2012 to Apr. 2012
Total Value
 2,139,000L.E.

Scope of Work

The works include excavation for the 400mm diverted Irrigation pipe line including providing excavation timber side support for about 900m length and installing the pipeline including all the steel fittings for pipe connections, manholes, valve, connection with the old pipeline and backfilling above the pipes ..