Suez thermal power plant 1X650 MW Gas/oil Fired unit – off shore works

Owner
East Delta Co. for electricity production Main Contractor
Archirodon Construction / El Dawlia Co. J.V.
Period
Expected 11/2012
Total Value
 52,000,000 L.E.

Scope of Work
  1. Dredging works for intake channel (100,000 m3).
  2. Riprap supply and installation works for the intake channel and discharge channel.
  3. Breakwater construction for the intake channel (about 330,000 m3 rock) includes underwater Geotextile installation.